During the
restore operation, both old and the new
Cloudera Data Engineering services
use the same resources allocated to the existing
Cloudera Data Engineering
service. Hence, you must double the resource pool size using the Quota Management
option. For example, if
root.default.sales is the pool that is
used for the old or existing
Cloudera Data Engineering service, you must
double the CPU and memory resources of this pool. Also, make sure that you have
sufficient hardware when doubling the resource pool size. Consider the following
conditions and plan whether to modify the resource pool size or not:
- If the Cloudera Data Engineering service uses the default resource
pool, that is root.default, then do not change the
resource pool size.
- If the Cloudera Data Engineering service uses a custom resource
pool (for example, root.default.primary.secondary), the
resource pool size of the last level (that
is,
secondary level in the example) must be doubled using the Quota Management
option. The additional capacity required after doubling the last level's
pool size is allocated from the levels above it, starting from the higher
levels and progressing downward. In this example, when you double the
secondary level (last level), the extra resource pool capacity required is
initially added to the primary level pool. Then the newly added resource
pool capacity is added to the secondary level pool, resulting in an overall
doubling of the resource pool size of the last level.
- The resource capacity at the Cloudera Data Engineering service and
the Virtual Cluster level must not be changed. Modifying the pool size at
the resource pool level is sufficient.